Close

February 16, 2010

Caribbean Hybrid System sees Integration Upgrades

Caribbean Hybrid System - AC Switching and Multi Generator Control

Optimal Power Solutions has recently completed upgrades to its software control at a privately-held island hybrid system in the Bahamas. OPS made various improvements in order to better support the islands unforeseen peak loads.

This included a new facility that enables separate diesel generators to charge a single battery bank simultaneously via the HPC power conditioning units. In addition, OPS also provided enhancements to its SCADA remote management software and improvements to the integration of the eight wind turbines.

We previously covered this project in an earlier article, Caribbean island lights up with OPS renewable energy technology.

Caribbean Project Photo Slideshow