Optimal Power wins Green Power Corp MW Project
18th November 2008
Optimal Power Solutions advises that the Green Power Corporation (India) 2MW solar power grid connected system to be installed in West Bengal, India will deploy OPS 250 kW power conditioning systems.
The lead contractor is Titan Solar Power from Hyderabad, India. Eight (8) numbers of these units will be used and managed under a Grid Connect management system developed by OPS. This system uses sequential control of power flow from each inverter so as to achieve maximum system efficiency.
The first one (1) megawatt is due to be installed in January 2009 and OPS anticipates an ongoing annual maintenance contract with Green Power Corporation. OPS will build and deliver these units from its manufacturing centre in Kolkata, India.